
Binding Machine Packing list Installation and Precautios
Packing list
1. 1 unit of machine
2. 1 set of soft cover template
3. 1 pcs of cable
4. 1 pcs of cross screw-driver
5. 1 pcs of M5 hexagonal socket spanner
6. 1 operate manual
7. 1 bag of glue
Installation
Please put this machine onto a stable worktop, avoid
approaching any humidity. Certain space should be kept to
operate the machine
Precaution
1. Connect to the specied power supply(220V/50Hz or 110V/60Hz).Open glue box cover, put in the solid glue. Note:
A.The glue should be clean and without any sundries.B Regularly add the glue particles into the glue box according to glue slurry
consumption. Thus a proper amount of glue slurry can be continuously supplied.
2. Turn on the switch, the glue to be heated under 170 degree about 15-20 minutes. During heating, don’t move the glue
box to avoid damage. Pay special attention to avoid the glue box touching hard thing during operating.
3. Make sure the template on the machine is accordant to the cover of binding file.(e.g. soft cover matches soft cover
template and hard cover le matches hard cover template)
4. Put the paddle on “N” position.
5. During the installation, if the gluing roller on the glue box is not parallel to the spine of the binding book, please adjust it
according to “Adjustment of the gluing roller” section in this manual. (page 11)
6. Milling cutter’s position can be adjusted by adjusting four screws. (page12)
4
Comentarios a estos manuales